GAS TURBINE SERVICES
Since our inception, we have specialized in large-frame natural gas-fired turbines. Our foremen and millwrights bring hundreds of years of combined experience to your plant. TOPS specializes in quality Combustion Inspections, Hot Gas Path Inspections, and Major Inspections of a wide range of gas turbines, including:
TOPS Historical Experience - All
| ||
---|---|---|
Date | Unit Type | Scope |
12/25/2020 | 6B | 2x Power Island Disassembly and relocation |
12/10/2020 | 7B | Major GT, Major Gen |
12/7/2020 | 7FA | Fuel Nozzle Swap |
12/3/2020 | Gen | Generator stator leak repair |
11/23/2020 | 501D5 | Warm up |
11/20/2020 | 7FA | Balance weight install |
11/10/2020 | 501F | Borescope inspection |
11/9/2020 | 501F | Borescope inspection |
11/6/2020 | 501F | Compressor blade blending |
11/6/2020 | 7FA | CDC Air Pipe repair |
11/4/2020 | 501F | Pipe fitters |
11/3/2020 | 501F | Hot gas path |
11/2/2020 | 501F | Gas leak investigation |
11/2/2020 | 7FA | Dog house pull |
11/2/2020 | Steam | Steam Minor |
10/30/2020 | 7FA | Vibration Analysis |
10/28/2020 | 7FA | Centerline air leak |
10/27/2020 | 501F | Borescope inspection |
10/26/2020 | 501AA | Modified Hot Gas Path (multiple) |
10/26/2020 | 7FA | Generator cooler |
10/26/2020 | 501F | Speed valve install on torque converter |
10/25/2020 | 501F | Borescope inspection |
10/23/2020 | 7FA | Generator soft feet |
10/22/2020 | 501F | Torque Converter |
10/20/2020 | 501F | Borescope inspection |
10/20/2020 | 501F | Basket swap and gas leak investigation |
10/19/2020 | 501F | Borescope inspection |
10/19/2020 | 501F | Borescope inspection |
10/18/2020 | 501F | Borescope inspection |
10/18/2020 | 501D5 | Borescope inspection |
10/14/2020 | 7FA | Turbine liner replacement |
10/12/2020 | 501F | Borescope inspection |
10/5/2020 | 501F | Borescope inspection |
10/5/2020 | 501F | Borescope inspection |
10/2/2020 | 7FA | Compressor water wash piping |
9/26/2020 | 501D5 | ADRE/Vibration Analysis |
9/25/2020 | 6B | Emergency transition repairs |
9/23/2020 | 501F | Borescope inspection |
9/22/2020 | 501F | Borescope inspection |
9/22/2020 | 501D5 | Generator air test |
9/20/2020 | 501D5 | Vibration Analysis |
9/19/2020 | 501D5 | Borescope inspection |
9/18/2020 | 501D5 | Oil Flush |
9/18/2020 | 6B | Welding Support |
9/14/2020 | 7FA | Magnetic Survey/Degauss |
9/10/2020 | 501F | Cooling pipe replacement |
9/4/2020 | 501D5 | Major - Additional manpower |
8/29/2020 | 7FA | Vibration Analysis |
8/26/2020 | 7FA | Vibration Analysis |
8/20/2020 | Steam | Remove and replace HP Valve |
8/15/2020 | 501D5 | Major |
8/14/2020 | 501D5 | Borescope inspection |
7/23/2020 | 6B | 2nd Stage buckets |
7/21/2020 | Borescope inspection | |
7/9/2020 | 501F | Support housing and baskert swap |
6/26/2020 | 501D5 | Balance Shot install |
6/23/2020 | 7FA | ADRE/Vibration Analysis |
6/22/2020 | 501F | Air piping leak |
6/22/2020 | 501D5 | ADRE/Vibration Analysis |
6/20/2020 | 501F | Orifice change out |
6/20/2020 | 501D5 | Borescope |
6/16/2020 | 501F | High blade path investigation |
6/16/2020 | 501F | Vibration Analysis |
6/15/2020 | 7FA | ADRE/Vibration Analysis |
6/12/2020 | 501F | Startin motor swap |
6/9/2020 | 6B | Rotor removal |
6/1/2020 | 501F | Borescope inspection |
6/1/2020 | 501F | Gearbox |
5/20/2020 | 501F | Witches hat swap |
5/19/2020 | Fr5 | Borescope Inspection - 5 Units |
5/12/2020 | 501F | Borescope inspection |
5/12/2020 | 7FA | Compressor blade replacement |
5/6/2020 | 501F | Orifice change out |
5/6/2020 | 7FA | Engineering |
5/4/2020 | 501F | Borescope inspection |
5/4/2020 | 501D5 | Exciter end repairs |
5/1/2020 | 501F | Hot Gas Path/Compressor BSI/Generator FTI |
4/30/2020 | Gen | Generator Rotor Swap |
4/27/2020 | 501F | Borescope Inspection |
4/27/2020 | 7FA | Hot Gas Path |
4/26/2020 | 7FA | Combustion Can Swapout |
4/21/2020 | 501F | Orifice change out |
4/20/2020 | 501F | Borescope inspection |
4/18/2020 | 501F | Split line weld |
4/17/2020 | 501F | Borescope Inspection |
4/14/2020 | 501D5 | Basket swap w/Engineering roof work |
4/13/2020 | 501D5 | Borescope Inspection |
4/13/2020 | 6B | Borescope Inspection |
4/6/2020 | 501F | Borescope Inspection |
4/4/2020 | 501F | Air Leak Inspection |
4/3/2020 | 7FA | Generator soft feet |
4/2/2020 | 7FA | TFA Support -Balance shot |
4/2/2020 | 6B | Crossfire tube replacement |
3/30/2020 | 501F | Iron Cross Leak |
3/29/2020 | 501D5 | Exciter leak repair |
3/26/2020 | 501F | Boiler feedwater pump - R&R suction/discharge piping |
3/26/2020 | 501F | Borescope Inspection |
3/24/2020 | 501F | Borescope inspection |
3/24/2020 | 7FA | Air Leak investigation |
3/23/2020 | 501F | Air vent reroute |
3/23/2020 | 501F | Borescope inspection |
3/22/2020 | 501F | Borescope Inspection |
3/17/2020 | 501D5 | Install Isophase Bus |
3/16/2020 | 501F | Borescope Inspection |
3/13/2020 | 7FA | TFA Support |
3/13/2020 | 7FA | Generator soft feet |
3/13/2020 | 501D5 | Generator exciter repairs |
3/12/2020 | 501F | FME Services |
3/12/2020 | 7FA | TFA Support |
3/11/2020 | 501F | TFA Support |
3/11/2020 | 501F | Cover pull on GT2/Replace compressor cylinder |
3/9/2020 | 501F | Major and Generator FTI services |
3/9/2020 | 501D5 | Borescope Inspection |
3/8/2020 | 501F | Borescope Inspection |
3/3/2020 | 7FA | TFA Support -Balance shot |
3/2/2020 | 7EA | TA Oversight - Major |
2/27/2020 | 7FA | Oil Leak Repair |
2/27/2020 | 501F | Row 1 ring segment swap |
2/25/2020 | Steam | Steam Turbine Overspeed Bolt Inspection |
2/25/2020 | 501F | Borescope Inspection |
2/24/2020 | 501F | ADRE Set up and Configuration |
2/24/2020 | 501D5 | Borescope Inspection |
2/21/2020 | 501F | Row 2 Vane Swap |
2/21/2020 | 501D5 | Starting Package Noise Investigation |
2/18/2020 | 501F | Generator oi leak investigation |
2/17/2020 | 501F | Torque Converter |
2/14/2020 | D5 | ADRE Vibration Analysis |
2/11/2020 | 501F | Borescope Inspection |
1/27/2020 | 6B | Replace gas valves - Oil leak repair |
1/22/2020 | 7FA | Vibration Analysis |
1/16/2020 | 501D5 | Combustion can gasket replacement |
1/16/2020 | 6B | Transition Piece Swap |
1/9/2020 | 7FA | Gasket steam leaks |
1/9/2020 | 501D5 | Torque Converter |
12/16/2019 | 7FA | Fuel Nozzle Swap |
12/10/2019 | 501F | Turning Gear Swap - Disassembly |
12/10/2019 | Fr5 | CI |
12/6/2019 | Hydro | Mech Support |
12/5/2019 | 7EA | Fuel Nozzle Swap |
12/2/2019 | 7EA | CIs |
11/23/2019 | 501F | Iron Cross |
11/4/2019 | Steam | Valve Inspection |
11/4/2019 | Gen | Gen Rotor Rewind Mechanical |
11/1/2019 | Steam | Valve Inspection & LP Major |
10/28/2019 | 7FA | Major |
10/27/2019 | 501D5 | Generator Exciter Bearing Leak |
10/22/2019 | 501F | Turbine Bearing Investigation |
10/20/2019 | 501F | Basket Swap |
10/15/2019 | 7FA | Oil Check Valve Swap |
10/14/2019 | D5 | Trunnion Insp & BSI Support |
10/11/2019 | 7FA | |
10/10/2019 | 501F | Iron Cross |
10/8/2019 | 7FA | Major |
10/8/2019 | 7FA | FTI |
10/4/2019 | 7FA | Major Staging |
10/1/2019 | 7FA | #1 Bearing Inspection |
9/29/2019 | 7FA | Mini CI |
9/27/2019 | 501D5 | Partial Basket Swap |
9/25/2019 | 7FA | FTI |
9/23/2019 | 7FA | Valve Inspection |
9/21/2019 | 501F | Compressor Inspection |
9/19/2019 | 501F | Torque Converter Swap |
9/7/2019 | 501F | Compressor Inspection |
8/24/2019 | 501F | Iron Cross / Cylinder Lift |
8/4/2019 | 501D5 | Basket Swap |
8/3/2019 | 7FA | Air Leak Repair |
7/31/2019 | 501F | Bearing Inspection |
7/13/2019 | 501D5 | Secondary Fuel Nozzle Swap |
7/9/2019 | 501AA | Rotor Pick |
7/3/2019 | 501AA | Diaphragm Reinstallation |
7/1/2019 | 501AA | Pins & Springs |
6/30/2019 | 501F | Support Housing Swap |
6/18/2019 | 501AC | BSI Mech Support |
6/18/2019 | 501F | Balance Shot |
6/11/2019 | 7EA | Torque Converter Swap |
6/6/2019 | 501F | Balance Shot |
6/5/2019 | 501AA | Compressor Blade Inspection |
5/28/2019 | Gen | Roof |
5/26/2019 | 501AA | Compressor Blade Inspection |
5/26/2019 | 501AA | Compressor Blade Inspection |
5/23/2019 | 501F | Iron Cross Leaks |
5/20/2019 | 501F | CI |
5/20/2019 | 501AA | Compressor Blade Inspection |
5/20/2019 | 501AA | Compressor Blade Inspection |
5/16/2019 | A10 | LP/IP Rotor Pull |
5/15/2019 | 7FA | #2 Bearing Swap |
5/14/2019 | 501F | Torque Converter Swap |
5/14/2019 | 501F | HGP |
5/13/2019 | 7B | Bearing Swap |
5/7/2019 | 7FA | Oil Deflector |
5/7/2019 | 501F | Misc. Row 1 Vane Replacement |
5/3/2019 | A10 | HP Turbine Reassembly |
4/29/2019 | 501F | Turbine Row 2 Vane Swap |
4/22/2019 | 501F | HGP & Gen FTI |
4/19/2019 | 501D5 | Orifice Plate Change Out |
4/15/2019 | 501F | Modified HGP |
4/14/2019 | 501F | Turbine Row 1 Blade Ring Swap |
4/14/2019 | 7FA | Major |
4/3/2019 | Gen | Lift Oil Hose Replacement |
4/1/2019 | 501F | Rotor Reinstallation |
3/25/2019 | Gen | Unit 1 Roof Repair, Unit 2 Roof/Bearing |
3/25/2019 | 7EA | HGP |
3/25/2019 | 501F | Exciter Reinstall |
3/21/2019 | 501D5 | CT Soddering |
3/18/2019 | 501F | Exciter Bearing/Diode Replacement |
3/16/2019 | 501F | Generator MW Support |
3/11/2019 | 7EA | Major |
3/8/2019 | 7FA | Stage 1 Bucket Swap |
3/7/2019 | 501F | MCV Actuator Swap |
3/4/2019 | 7FA | Fuel Nozzle Swap |
3/4/2019 | 7FA | Can 5 Liner Swap |
3/2/2019 | 7FA | Can 3 Liner Cap Swap |
2/28/2019 | 6B | HGP |
2/27/2019 | 501D5 | Orifice Plate & IGV Actuator Swap |
2/25/2019 | 7B | Startup Support |
2/21/2019 | 501D5 | CT Swap Mechanical Support |
2/18/2019 | Gen | Gen Mechanical Support |
2/18/2019 | 501D5 | Startup Support |
2/16/2019 | 7FA | Exhaust Case Doweling |
2/14/2019 | 501F | |
2/14/2019 | 501F | Oil Leak Investigation |
2/13/2019 | 501F | Orifice Plate & Balance Weight |
2/2/2019 | 501D5 | Major Reassembly |
2/1/2019 | 7FA | ADRE & Vibration Analysis |
1/31/2019 | 501D5 | Overspeed Trip |
1/30/2019 | 501F | Rotor Pull |
1/29/2019 | 7FA | Coupling Bolt |
1/21/2019 | 501D5 | CI |
1/16/2019 | 501F | Minor |
1/14/2019 | 7FA | HGP |
1/14/2019 | 7FA | FTI |
1/14/2019 | 501D5 | Major Disassembly |
1/14/2019 | 501F | HGP |
1/14/2019 | 501F | FTI |
1/14/2019 | 501F | Gen FTI |
1/10/2019 | D5A | Overspeed Trip Inspection / Fuel Nozzle Swap |
1/7/2019 | Gen | Field Pull |
12/9/2018 | 501D5 | Borescope Inspection |
12/2/2018 | 501D5 | Borescope Inspection |
11/30/2018 | 501F | Collector Work |
11/30/2018 | 501F | Exciter Bearing Inspection |
11/26/2018 | 501F | Hot Gas Path |
11/26/2018 | 7FA Gen | Generator Field Pull |
11/9/2018 | 7FA | R2 R3 Changeout |
11/8/2018 | 501F | Borescope Inspection |
11/7/2018 | 501F | Borescope Inspection |
11/7/2018 | 501F | Iron cross |
11/5/2018 | 7F | Instrument Tech |
11/5/2018 | 7FA | Thrust Bearing Repair |
11/1/2018 | 501F | Spring can bolt replacement |
10/31/2018 | 501F | Borescope Inspection |
10/29/2018 | 501F | Borescope Inspection |
10/24/2018 | 7FA | Shroud block staking |
10/23/2018 | 501F | Borescope Inspections |
10/22/2018 | 501D5 | CT101 Basket Change out |
10/22/2018 | 501F | Borscope Inscpection and Belly Bands |
10/22/2018 | 501F | Row 4 Turbine Blade Replacement |
10/22/2018 | Steam | MSCV Bonnet Holes |
10/22/2018 | Steam | Valve Stem and Assembly Swap |
10/21/2018 | 501F | Borescope Inspection |
10/21/2018 | 501F | GT2 Iron Cross |
10/19/2018 | 501F | GT2 Mechanical support |
10/17/2018 | 501F | BSI Compressor |
10/17/2018 | 501F | Borescope Inspections and Belly Bands |
10/16/2018 | 501F | HGP Secondary Scope B |
10/15/2018 | 501F | Hot Gas Leak Investigation |
10/15/2018 | 501F | Borescope Inspection + Belly Bands |
10/14/2018 | 501F | Iron Cross and Orifice Plate |
10/14/2018 | 501F | Borescope Inspection |
10/14/2018 | 501F | Hot Gas Leak Investigation |
10/11/2018 | 7FA | Oil Pump Inspection |
10/10/2018 | 501D5 | Borescope Inspection |
10/10/2018 | 7F | Hot Gast Path |
10/7/2018 | 501F | Borescope Inspection |
10/7/2018 | 501F | Borescope Inspection |
10/7/2018 | 501F | Borescope Inspections and Belly Bands |
10/2/2018 | 501F | Iron Cross Welding |
9/17/2018 | 501F | Borescope Inspection |
9/16/2018 | 501F | HP Bleed Valve Open and Close |
9/6/2018 | 501D5 | Fuel Nozzle, Basket, Pilot |
9/4/2018 | 501F | Boileer Feedwater pump #8 |
8/26/2018 | 501F | Disc Cavity 4 Single Orifice Plate Swap |
8/8/2018 | 7FA | Fuel Nozzle Change - #12 |
8/6/2018 | 7FA | H2 Seal & Seaing housing replacement |
8/4/2018 | 7FA | H2 Seal Engineering |
8/3/2018 | 501D5 | Partial Fuel Nozzle Swap/Borescope |
8/1/2018 | D11 | Vibration analysis |
7/13/2018 | D11 | Oil Leak |
7/13/2018 | D11 | Oil Leak |
7/3/2018 | 7F | ADRE Rental |
6/30/2018 | 501F | Repair 4-way hot gas leak at the split line |
6/6/2018 | 501F | Swap out HP Bleed line gasket swap |
6/2/2018 | 501F | Support housings and Nozzle Swap |
6/1/2018 | 501F | Borescope compressor |
5/29/2018 | 501F | vibration analysis |
5/27/2018 | 501F | Orifice Plate change |
5/25/2018 | 501D5 | R1-R3 Turbine Blade Replacement |
5/24/2018 | 501D5 | Support of 2018 Major Inspection |
5/24/2018 | 501F | Blend Compressor blades |
5/24/2018 | 7F | Mechanical support for scope creep |
5/23/2018 | 501D5 | Nozzle and gasket swap |
5/23/2018 | 501D5 | Combustion Tuning/Start Up |
5/22/2018 | 501D5 | Transition pieces and hardware kits |
5/21/2018 | 501D5 | Major |
5/21/2018 | 501F | Modified Hot Gas Path |
5/18/2018 | 7F | Mechanical support for scope creep |
5/16/2018 | 501AC | Borescope inspection |
5/14/2018 | 501F | Gas blows and start up support |
5/14/2018 | 501F | Borescope Inspection and Belly Bands |
5/11/2018 | 501F | Orifice Plate change |
5/11/2018 | 501F | ADRE Rental |
5/10/2018 | 501D5 | Fuel Nozzle Swap |
5/9/2018 | 7F | RG GT1 Extra work (BT and MW) |
5/7/2018 | 501F | CI w/Row 1 Vane and BSI Secondary scopes |
5/6/2018 | 501D5 | Borescope inspection |
5/4/2018 | D11 | Valve inspection |
4/28/2018 | 501D5 | Borescope inspection |
4/28/2018 | 501F | Borescope inspection |
4/27/2018 | 501F | Iron cross GT3 |
4/24/2018 | 7FA | Bucket Tech |
4/23/2018 | 501F | Cylinder Lift/4 Way Joint |
4/23/2018 | 501F | Borescope inspection |
4/23/2018 | 7F | Riverhawk rental, ADRE, turning gear swap |
4/21/2018 | 7F | GT1/GT3 Hot Gas Path |
4/21/2018 | 7F | GT1/GT3 Hot Gas Path |
4/11/2018 | 501F | Borescope Inspection |
4/9/2018 | 7FA | Fuel Nozzle Swap |
4/9/2018 | MS5001M | Major |
4/9/2018 | MS5001M | Hot Gas Path/CI/Generator Inspection |
4/5/2018 | 501F | Top Hat drilling |
4/3/2018 | 501F | Air Leak EWA labor |
4/3/2018 | 7EA | IGV Measuring |
4/2/2018 | 501F | Hot Gas Path GT2/Borescope Inspection |
4/2/2018 | 501F | Borescope inspection plus molds |
4/2/2018 | 501F | Replace inlet fogging nozzles |
4/2/2018 | 7FA | Bearing Inspection |
4/2/2018 | 7FA | Major GT3 |
3/28/2018 | 7F | Flex Seal/Exhaust mechanical support |
3/26/2018 | 501D5 | Generator Field Installation |
3/26/2018 | 501F | Cylinder Lift/4 Way Joint |
3/24/2018 | 7FA | Modified CI |
3/22/2018 | Hydro | Clear variable guide vanes |
3/21/2018 | 501D5 | Install oil pump motor |
3/19/2018 | 501F | Borescope GT3 |
3/19/2018 | 501F | Witches Hats Labor |
3/19/2018 | 7FA | ADRE Rental |
3/18/2018 | 501F | Borescope GT3 |
3/13/2018 | 501F | Leak Repair |
3/12/2018 | 501D5 | Basket Change |
3/12/2018 | 7FA | MSV Pressure Seal Gasket Replacement |
3/12/2018 | 7FA | Bearing swap services |
3/11/2018 | 501F | Borescope GT1 |
3/11/2018 | 501F | Borescope GT1 |
3/10/2018 | 501D5 | Engineering Support |
3/9/2018 | 7FA | Rotor Pull |
3/9/2018 | 7FA | Compressor Stator/Rotor Pull |
3/8/2018 | 7FA | Bearing oil leak |
3/6/2018 | 501F | Borescope GT4 |
3/5/2018 | 7FA | Fuel Nozzle Swap |
3/4/2018 | 501F | Borescope GT2 |
2/27/2018 | 7FA | ADRE Rental |
2/26/2018 | 501F | Borescope GT3 |
2/26/2018 | 501F | Leak Investigation |
2/26/2018 | 7FA | Generator tooling |
2/24/2018 | 7FA | Auxiliary Control Valve Swap |
2/24/2018 | Steam | ST-4 Valve & Diffuser Support |
2/20/2018 | 501F | Row 2 Change out |
2/15/2018 | 501F | Rexroth MCA actuator swap |
2/14/2018 | 7EA | Pass Through |
2/14/2018 | 7FA | Generator Seal and Housing replacement |
2/13/2018 | 501F | vibration analysis |
1/29/2018 | 501F | Borescope GT1 |
1/27/2018 | 7FA | Turning Gear |
1/15/2018 | 501F | Major |
1/15/2018 | 501F | Generator Support |
1/15/2018 | 501F | Major |
1/12/2018 | None | Purchase |
1/9/2018 | 501D5 | Basket Change |
1/8/2018 | 501d5 | Field Engineer |
12/16/2017 | 7FA | Rotor replacement |
12/15/2017 | 7EA | HGP & ST Gen |
12/9/2017 | 501F | 4 Way joint leak repair |
12/2/2017 | 501F | Borescope Inspection |
11/29/2017 | Units 4-5 Borescope Inspection | |
11/28/2017 | Case removal - Leak investigation | |
11/27/2017 | 501F | Misc Mechanical Maintenance |
11/25/2017 | 501F | BSI - Orifice Plate Change |
11/16/2017 | 501F | Balance Shot - Engineer |
11/10/2017 | 501D5 | GTA/GTC Borescope Inspections |
11/6/2017 | 501F | GT3/GT4 - Borescope Inspection |
11/4/2017 | 501F | Borescope Inspection |
10/25/2017 | 501F | Borescope Inspection wMolds |
10/23/2017 | 501F | GT1/GT2 Borescope Inspections |
10/9/2017 | 501F | Generator oil supply line gaskets services |
10/9/2017 | 501F | GT1/GT6 BSI + Molds |
10/7/2017 | 7FA | Turning Gear Replacement |
10/4/2017 | 501F | Borescope Inspection |
10/2/2017 | 501d5 | Waiau - TFA |
10/2/2017 | 501F | Lift Beam Moving Services |
9/30/2017 | 501F | Borescope Inspection w/Molds - Subbed |
9/29/2017 | 501F | HPComp Bleed Valve Swap |
9/25/2017 | 501D5 | Borescope |
9/25/2017 | 501D5 | Borescope |
9/19/2017 | 501F | GT2 Start up Support |
9/17/2017 | 501D5 | HPCV work |
9/16/2017 | 501F | BSI GT2 - GT3 |
9/14/2017 | 501D5 | Bearing Inspection |
9/8/2017 | 501D5 | Governor Valve Inspection |
8/17/2017 | GT10 BSI/Check-Measure IGV Angles | |
7/24/2017 | Starting Package Investigation | |
7/19/2017 | 7FA | Bearing Conversion Kit |
7/19/2017 | Bearing Conversion Kit | |
7/18/2017 | GT101 | Flex Seal Replacement |
7/18/2017 | GT101 | Flex Seal Replacement |
7/14/2017 | GT1 | Borescope GT1 |
7/14/2017 | GT1 | Borescope GT1 |
7/13/2017 | GT2 | BSI GT2 |
7/13/2017 | 501FC | Pasadena Rigging Support |
7/13/2017 | GT2 | BSI GT2 |
7/13/2017 | 501FC | Pasadena Rigging Support |
7/3/2017 | GT3/GT4 | Borescope |
7/3/2017 | GT3/GT4 | Borescope |
6/29/2017 | GTA | Blade Swap |
6/29/2017 | GT3/GT4 | Torque Converter |
6/29/2017 | GT1 | Borescope |
6/29/2017 | GTA | Blade Swap |
6/29/2017 | GT3/GT4 | Torque Converter |
6/29/2017 | GT1 | Borescope |
6/26/2017 | GT1 | Basket Change out |
6/26/2017 | GT1 | Basket Change out |
6/25/2017 | 501F | GT2 Unit Pilot and IGV Inspection |
6/24/2017 | 501D5 | BSI GT2 |
6/13/2017 | 501d5 | Mobile Macine |
6/13/2017 | 501F | BSI GT2 |
6/13/2017 | 501F | BSI GT1 |
6/13/2017 | 501d5 | Mobile Macine |
6/13/2017 | 501F | BSI GT2 |
6/13/2017 | 501F | BSI GT1 |
6/8/2017 | 501D5 | ADRE |
6/8/2017 | 501D5 | ADRE |
6/7/2017 | 501F | Engineer |
6/7/2017 | 501F | Engineer |
6/5/2017 | 501D5 | GT C Major |
6/5/2017 | 501d5 | Engineer |
6/5/2017 | 501D5 | GT C Major |
6/5/2017 | 501d5 | Engineer |
5/31/2017 | Gen | GT 4 Generator |
5/31/2017 | GEn | GT 3 Generator |
5/31/2017 | Gen | GT 4 Generator |
5/31/2017 | GEn | GT 3 Generator |
5/30/2017 | Steam | Subcontracted Field mach |
5/30/2017 | Gen | GT C Gen |
5/30/2017 | Gen | ST Generator |
5/30/2017 | Steam | Subcontracted Field mach |
5/30/2017 | Gen | GT C Gen |
5/30/2017 | Gen | ST Generator |
5/24/2017 | Steam | Engineer |
5/24/2017 | Steam | Engineer |
5/23/2017 | 7FA | GT 3 Hot Gas Path |
5/23/2017 | 501F | Combustion Inspection |
5/23/2017 | Steam | ST Major |
5/23/2017 | 501F | Combustion Inspection |
5/23/2017 | Steam | ST Major |
5/23/2017 | 7FA | GT 3 Hot Gas Path |
5/22/2017 | Steam | Engineer |
5/22/2017 | Steam | Engineer |
5/10/2017 | 7FA | Tooling |
5/10/2017 | 7FA | Engineer |
5/10/2017 | 501F | Engineer |
5/10/2017 | 7FA | Tooling |
5/10/2017 | 7FA | Engineer |
5/10/2017 | 501F | Engineer |
5/9/2017 | 7FA | GT 4 Hot Gas Path |
5/9/2017 | 7FA | GT 3 Hot Gas Path |
5/9/2017 | 501F | Engineer |
5/9/2017 | 501f | IGV |
5/9/2017 | 501F | Case Bolts |
5/9/2017 | 501F | Engineer |
5/9/2017 | 501f | IGV |
5/9/2017 | 501F | Case Bolts |
5/9/2017 | 7FA | GT 4 Hot Gas Path |
5/9/2017 | 7FA | GT 3 Hot Gas Path |
5/8/2017 | 501D5 | Engineer |
5/8/2017 | 501F | Row 1 Vane |
5/8/2017 | 501D5 | Engineer |
5/8/2017 | 501F | Row 1 Vane |
4/26/2017 | 7FA | Tooling |
4/26/2017 | 7FA | Tooling |
4/25/2017 | 501F | Turbine R1 Vane Replacement |
4/25/2017 | D5 | Iron Cross Midification |
4/25/2017 | 501F | BSI |
4/25/2017 | 501F | Fuel Nozzle |
4/25/2017 | 501DF | Borescope |
4/25/2017 | 501F | Borescope |
4/25/2017 | 501F | Borescope |
4/25/2017 | 501F | Turbine R1 Vane Replacement |
4/25/2017 | D5 | Iron Cross Midification |
4/25/2017 | 501F | BSI |
4/25/2017 | 501F | Fuel Nozzle |
4/25/2017 | 501DF | Borescope |
4/25/2017 | 501F | Borescope |
4/25/2017 | 501F | Borescope |
4/24/2017 | Gen | ST Generator |
4/24/2017 | Gen | GT C Gen |
4/24/2017 | Gen | ST Generator |
4/24/2017 | Gen | GT C Gen |
4/20/2017 | 7EA | Leak Investigation & Repair |
4/20/2017 | 7EA | GT 1 Leak Repair |
4/20/2017 | 7EA | Leak Investigation & Repair |
4/20/2017 | 7EA | GT 1 Leak Repair |
4/18/2017 | 501D5 | GT C Major |
4/12/2017 | 7FA | Nozzle changeout |
4/12/2017 | 7FA | Turning Gear |
4/11/2017 | 501D5 | GT C |
4/11/2017 | Steam | Major |
4/10/2017 | Gen | GTC Gen |
4/10/2017 | 501D5 | GT 96 4 Way |
4/10/2017 | Gen | Bearing Investigation |
4/10/2017 | Gen | ST 4 Gen |
4/3/2017 | Steam | Major |
4/3/2017 | Generator | Major |
4/3/2017 | D5 | Major |
4/3/2017 | Generator | Major |
4/3/2017 | D5A | Hot Gas Path |
4/3/2017 | D5A | Hot Gas Path |
3/31/2017 | 7FA | Mist Eliminator |
3/23/2017 | 7FA | Shim Compressor |
3/22/2017 | Steam | Engineering Support |
3/17/2017 | 7EA | Engineering Support |
3/16/2017 | 7FA | HGP Unit 4 |
3/15/2017 | 501F | BSI |
3/15/2017 | 7FA | ADRE Rental |
3/15/2017 | 501F | Borescope |
3/14/2017 | D5 | Disassembly |
3/13/2017 | 7FA | HGP |
3/13/2017 | 7FA | Rotor-Out HGP |
3/1/2017 | 501F | BSI |
3/1/2017 | 7FA | HGP Unit 4 |
3/1/2017 | 501F | Borescope GT 3 |
3/1/2017 | 7FA | HGP Unit 5 |
3/1/2017 | 501F | Trunion & IGV |
2/22/2017 | 501D5 | GT 103 Dissasembly |
2/16/2017 | Steam | TA |
2/14/2017 | 501F | Borescope GT 1 |
2/13/2017 | 501F | R1 Vane |
2/13/2017 | Steam | Steam Chest |
2/13/2017 | 501F | Borescope GT 1 |
2/7/2017 | Aero | |
12/21/2016 | 7FA | Tool Set Up |
12/21/2016 | 7FA | Major and Generator |
12/19/2016 | 501F | Subcontracted |
12/14/2016 | 7FA | Vibration Support |
12/14/2016 | 501D5 | Borescope Inspection CT10 |
12/12/2016 | 501F | 4 Way Joint Repair |
12/12/2016 | 501F | 4 Way Joint Repair |
12/12/2016 | 501F | 4 Way Joint Repair |
12/12/2016 | 501F | 4 Way Joint Repair |
12/12/2016 | 501F | 4 Way Joint Repair |
12/9/2016 | 501F | Various Adders |
12/7/2016 | 7FA | Hot Gas Path |
12/7/2016 | 501F | Borescope |
12/7/2016 | 501F | Borescope |
12/7/2016 | 501F | Borescope |
12/7/2016 | 501F | Speed Probe Inspectin |
12/7/2016 | 501F | Actuator |
12/7/2016 | 501F | IGV Support |
11/30/2016 | 501D5 | Borescope |
11/30/2016 | 501D5 | Borescope |
11/30/2016 | 501F | Borescope |
11/30/2016 | 501F | Borescope |
11/30/2016 | 501F | ADRE Rental |
11/28/2016 | 7FA | Hot Gas Path |
11/17/2016 | 501F | Borescope |
11/15/2016 | 501F | Borescope |
11/15/2016 | 501F | Exhaust Cylinder Removal |
11/15/2016 | 501F | Exhaust Manifold |
11/15/2016 | 501F | Plant Maintenance |
11/15/2016 | 501F | Milling |
11/14/2016 | 501F | Borescope |
11/14/2016 | 501D5 | Borescope |
11/14/2016 | 501D5 | borescope |
11/14/2016 | 501F | Borescope |
11/14/2016 | 501F | Borescope |
11/14/2016 | 501D5 | Trunion Lugs |
11/14/2016 | 501D5 | Tranition Piece |
11/14/2016 | 501D5 | Combustion Inspection |
11/14/2016 | 501D5 | Hot Gas Path |
11/14/2016 | 501D5 | Alignemnet Check |
11/14/2016 | 501D5 | |
11/14/2016 | 501F | BSI PD GT 2 |
11/8/2016 | 501F | BSI |
11/3/2016 | 501F | Generator |
11/3/2016 | 501F | Torque Converter |
10/27/2016 | 501F | Major |
10/27/2016 | 501F | End Shield Remvoal |
10/26/2016 | ST | End Shield Remvoal |
10/24/2016 | 7FA | Tech Adv. Vibration Analysis |
10/21/2016 | 501D5 | Fuel Nozzle |
10/6/2016 | 501F | Startup Support |
9/29/2016 | 501D5 | Borescope |
9/28/2016 | 7FA | TA Vibration Analysis |
9/27/2016 | 501F | GT 3 Failed Startup |
9/25/2016 | 501D5 | Borescope |
9/8/2016 | 7FA | GT-1 Data Review and Site Visit |
9/8/2016 | 501D5 | GT-A Balance Shot |
9/8/2016 | 501D5 | GT-C Balance Shot |
9/7/2016 | 501F | GT-3 Replace Pilots and Support Housing |
8/25/2016 | 501F | |
8/1/2016 | 501F | Mod CI |
8/1/2016 | 501F | GT1 BSI |
6/1/2016 | 501AC | GT1 BSI |
5/27/2016 | 501D5 | Exciter Install |
5/26/2016 | 7FA | GT 1 Balance Shot |
5/26/2016 | 501F | GT 1 Borescope |
5/26/2016 | 501D5 | GTC Borescope |
5/26/2016 | 501D5 | GT 104 Borescope |
5/26/2016 | 501F | Gt 2 Borescope |
5/26/2016 | 501D5 | BSI |
5/25/2016 | 501D5 | Combustion Inspection |
5/25/2016 | 501D5 | Basket Change |
5/20/2016 | 7FA | Combustion Inspection |
5/6/2016 | 7FA | GT 1 HGP |
5/6/2016 | 7Fa | GT 2 HGP |
5/6/2016 | ST | Steam Turbine Minor |
5/4/2016 | Gen | Rotor and Exciter Install |
5/4/2016 | 501F | Mod CI |
5/3/2016 | Gen | Generator Additional Support |
4/20/2016 | 501F | Technical Advisor |
4/19/2016 | 501F | GT 3 Row 1 Vane |
4/18/2016 | 7Fa | GT 4 Bucket Blending |
4/15/2016 | 7EA | Engineering Support |
4/13/2016 | 7EA | Generator Alignement |
4/12/2016 | 7FA | Balance shot |
4/12/2016 | 501D5 | R1 Vane |
4/12/2016 | 501F | BSI |
4/11/2016 | 7FA | Major GT 1 |
4/11/2016 | 7FA | Major GT 2 |
4/8/2016 | 501F | Borescope 3, 4 |
4/8/2016 | 501F | Borescope GT 1 |
4/8/2016 | 501f | GT 1 and GT 2 BSI |
4/8/2016 | 501F | Boresocpe Gt 1, 2 |
4/6/2016 | 501F | Boresocpe Gt 2, 3, 4 |
4/4/2016 | 7FA | Crossfire Tubing |
3/29/2016 | 501D5 | Row 1 Vane Seal |
3/25/2016 | 501D5 | Row 4 Blending |
3/24/2016 | 7FA | Borescope |
3/24/2016 | 7FA | GT 1 Crossfire Tube Replacement |
3/23/2016 | 7FA | Fuel Nozzle |
3/22/2016 | 501D5 | Borecopes GTC |
3/22/2016 | 501D5 | Borecopes GTC |
3/22/2016 | 501D5 | Basket Change GT A |
3/22/2016 | 501D5 | Borescope GTA and GTB |
3/9/2016 | Gen | Generator Inspection |
2/17/2016 | 501F | Deer Park BSIs and Molds |
2/11/2016 | 501F | Borescope CT 2 |
2/11/2016 | 501F | Borescope GT 2 and GT 3 |
2/10/2016 | 501F | Borescope CT 1 |
2/10/2016 | 501F | Witches Hat Cleaning |
2/10/2016 | 501D5 | Boresocpe GT 102 |
2/9/2016 | 7FA | Hot Gas Path |
2/9/2016 | 501F | Fuel Nozzle GT 2 |
2/9/2016 | 501D5 | Support Housing and Pilot Swap |
2/9/2016 | 7EA | Accessory Coupling Hub |
1/22/2016 | 7EA | Major Reassembly |
1/19/2016 | 501F | Borescope GTA and GTB |
1/14/2016 | 501F | Witches Hat Cleaning |
1/12/2016 | 501F | Row 4 Blending |
1/6/2016 | 501F | Fuel Nozzle GT 3 |
1/4/2016 | 501F | Basket Change GT 3 |
12/14/2015 | 501F | LS Power Decatur |
12/14/2015 | Steam | ST 5 Minor |
12/14/2015 | Steam | ST 5 Generator |
12/11/2015 | 501F | Channel GT 3 CI |
12/11/2015 | 501F | Channel GT 3 Cover Pull |
12/10/2015 | 501D5 | GT 104 and GT 102 BSI |
12/10/2015 | 501D5 | GTC BSI |
12/9/2015 | 501F | GT 1 and 2 BSI |
12/9/2015 | 501F | Gt 1 BSI |
12/8/2015 | 501F | GT 1 and 2 BSI |
12/7/2015 | 501F | GT 2 and GT 3 BSI |
12/4/2015 | 7FA | GT 2 Major |
12/4/2015 | 7FA | GT 2 Secondary Lbor |
12/4/2015 | 7FA | Nightshift Engineer GT 2 |
12/4/2015 | 7FA | Nightshift Engineer GT 1 |
12/4/2015 | 7FA | GT 2 Belly Band |
12/3/2015 | 7FA | Major GT 1 Final |
12/3/2015 | 7FA | Major GT 1 Secondary Labor |
12/3/2015 | 501D5 | GT A and C BSI |
12/3/2015 | 501D5 | GT B BSI |
11/30/2015 | Generator Removal | |
11/30/2015 | Generator Removal Delay | |
11/30/2015 | 501F | GT 3 CI |
11/23/2015 | 7FA | Generator GT1 |
11/23/2015 | 7FA | Generator GT2 |
11/23/2015 | D11 | Generator ST |
11/23/2015 | D11 | H2 Cooler Removal |
11/18/2015 | 7FA | Blending |
11/18/2015 | D11 | ST Final |
11/11/2015 | 7FA | Major GT 1 |
11/11/2015 | 7FA | Major GT 1 Secondary Labor |
11/11/2015 | 7FA | Major GT 2 |
11/11/2015 | 7FA | Major GT 2 Secondary Labor |
11/9/2015 | ||
11/9/2015 | 501D5 | CI |
11/9/2015 | 501F | Major |
11/9/2015 | 501F | Machining Tools |
11/4/2015 | 7FA | Technical Advisor |
11/3/2015 | D11 | ST 5 Minor |
11/2/2015 | 501F | Iron Cross |
11/2/2015 | 501F | Torsion Bar |
11/2/2015 | 501F | Major |
10/28/2015 | 7FA | Rotor Pull |
10/21/2015 | 501F | Vane Replacement |
10/20/2015 | 501F | Borescope |
10/20/2015 | 501F | Trunion Repair |
10/15/2015 | 501F | Mechanical Support |
10/14/2015 | 501F | Witches Hat Cleaning |
10/8/2015 | 7FA | Basket Change |
10/8/2015 | 501F | Borescope |
10/8/2015 | 501F | Borescope |
10/8/2015 | Steam | Valve Support |
10/8/2015 | 501F | Top Hat Cleaning |
10/7/2015 | 7FA | Fuel Nozzle Change |
10/3/2015 | 501D5 | Cranking Motor |
10/2/2015 | 501F | Borescope |
10/1/2015 | 501F | Basket Change |
9/29/2015 | 7FA | Rotor Pull |
9/28/2015 | 501D5 | Vibration Analysis |
9/28/2015 | 501D5 | Welder |
9/28/2015 | 501D5 | Loading and Unloading |
9/22/2015 | Gear Rebuild | |
9/1/2015 | 501D5 | Balance Shots |
8/28/2015 | 7EA | Subcontracted Services |
8/21/2015 | 7EA | Generator Field Pull |
8/21/2015 | 7EA | Generator Reassembly |
8/18/2015 | 501D5 | BSI and Balance shot |
8/14/2015 | 501d5a | Borescope |
8/13/2015 | 501D5A | GT 103 Leak Repair |
8/12/2015 | 501F | Oriface Plate |
8/11/2015 | 501F | GT4 & GT2 Orifice Plate Change Out |
8/11/2015 | 501F | GT4 Orifice Plate Change out |
8/5/2015 | 501F | GT-B Turnkey BSI |
7/28/2015 | Engineering Consulting Services | |
7/27/2015 | Pump and Freight | |
7/21/2015 | 501F | Oriface Plate |
7/20/2015 | Technical Advisor | |
7/15/2015 | 501F | Baytown GT 2 4 Way Split |
7/9/2015 | 501D5 | Borescope |
7/9/2015 | 501F | Borescope |
7/9/2015 | 7B | Tech Advisor |
7/9/2015 | 501F | Mold Evaluation |
7/8/2015 | 7FA | GT 4 Fuel Nozzle |
7/8/2015 | 501f | Oriface Plate |
7/7/2015 | 501F | Borescope |
7/7/2015 | 501F | Basket Change |
7/1/2015 | 501F | Borescope |
6/30/2015 | 501F | Steam Turbine TA |
6/24/2015 | 501F | Witches Hat Cleaning |
6/20/2015 | 7EA | TA |
6/17/2015 | 501F | Torsion Bar Change out |
6/17/2015 | 501F | Subcontracted Services |
6/16/2015 | Tool Kit Sale | |
6/15/2015 | 501F | Borescope |
6/12/2015 | 501F | Compressor Cover lIft |
6/11/2015 | 501D5 | Borescope |
6/11/2015 | 501D5 | Combustion Inspection plus |
6/10/2015 | 501F | Borescope |
6/10/2015 | 501D5 | Borescope |
6/10/2015 | 501F | GT 3 Basket Change |
6/10/2015 | 501F | Dental Molds |
6/10/2015 | 501F | Shipment Offloading |
6/9/2015 | 501D5 | Borescope |
6/9/2015 | 501F | Borescope |
6/9/2015 | 501F | Borescope |
6/9/2015 | 501F | Pipe Removal |
6/9/2015 | 501F | IGV Measuring |
6/9/2015 | 501F | Oriface Plate |
6/9/2015 | 501F | GT 1 Basket Change |
6/5/2015 | Steam | Steam Turbine Vibration Analysis |
6/5/2015 | IGV Crack Repairs | |
6/3/2015 | Steam | ST Minor |
6/3/2015 | Steam | ST Minor TA |
6/1/2015 | 501F | Vane Replacement |
5/26/2015 | 7FA | GT-1 Fuel Nozzle Change out |
5/26/2015 | Steam | ST Generator |
5/14/2015 | CT-3 Position 11 Combustor Basket | |
5/13/2015 | 7FA | GT 4 HGP and Gen |
5/12/2015 | STG Generator Alignment | |
5/12/2015 | 7FA | Double HGP and Gen |
5/8/2015 | 501D5 | Cover Lift |
5/8/2015 | GT-1 Combustion Inspection | |
5/8/2015 | 501G | GT-3 Row 4 Seal Repair |
5/8/2015 | 501F | Unit 2 Row 4 Change out |
5/5/2015 | Steam | ST-1 Inspection |
5/4/2015 | 7FA | Double HGP and Gen |
4/29/2015 | 6B | 6B TA Support |
4/29/2015 | Gen | ST 5 Generator |
4/27/2015 | 501F | GT-3 Major Inspections |
4/27/2015 | 7FA | Double HGP and Gen |
4/23/2015 | 501F | IGV Measuring |
4/21/2015 | 7FA | Double HGP and Gen |
4/16/2015 | 7FA | GT 4 HGP and Gen |
4/15/2015 | 501F | GT-3 Major Inspections |
4/15/2015 | Gen | ST 5 Generator |
4/10/2015 | 7FA | Combustion Inspection |
4/10/2015 | 7FA | Major |
4/8/2015 | Steam | ST-1 Inspection |
4/7/2015 | 501D5 | GT-102 Combustion Inspection |
4/7/2015 | CT-4 Change out regulator and OST valve | |
4/6/2015 | 501F | GT-3 Major Inspections |
4/6/2015 | 501F | GT-3 Compressor Blades Blending |
4/5/2015 | GT-1 H2 Seal Repair | |
4/1/2015 | 6B | 6B TA Support |
3/31/2015 | 501F | GT-3 Major Inspections |
3/31/2015 | 501F | GT-4 BSI |
3/26/2015 | 501F | GT 2 Top Hat / Fuel Nozzle |
3/26/2015 | 501F | GT-1 BSI and Dental Molds |
3/26/2015 | 501F | GT-1 Start Up Support |
3/25/2015 | 501F | GT-1 BSI and Dental Molds |
3/24/2015 | 501F | GT-3 Major Inspections |
3/14/2015 | Pump | Blowdown Pump |
3/12/2015 | 501F | GT 4 Compressor Clean |
3/11/2015 | 501F | GT-2 BSI |
3/10/2015 | Repairs to the BP TC's on CT6 | |
3/10/2015 | 501F | GT-1 BSI - Differential DT Hours |
3/10/2015 | 7B | Tech Advisor - Travel |
3/10/2015 | 501F | GT-2 BSI |
3/9/2015 | 501F | GT-3 BSI |
3/9/2015 | 501F | GT-1 BSI |
2/24/2015 | Engineering Consulting Services | |
2/24/2015 | Steam Turbine Gantry | |
2/17/2015 | 501F | GT-2 Static Seal Move |
2/17/2015 | 501F | GT-2 Gas Leak and Start up Support |
2/9/2015 | CT-4 Starting Package Repairs | |
2/6/2015 | 501F | GT-1 BSI/Dental Molds |
2/6/2015 | 501F | GT-2 BSI/Dental Molds |
2/5/2015 | 501F | GT-1,6 Molds/GT-4 BSI/Molds |
2/4/2015 | 501F | GT-2 Dental Molds |
2/3/2015 | 501D5 | GT-104 BSI |
2/3/2015 | 501F | GT-3 BSI |
2/3/2015 | 501D5 | GT-A BSI |
1/27/2015 | 501D5 | GT-103 Hot Gas Path |
1/26/2015 | 501D5 | GT-A Combustion Inspection |
1/23/2015 | 7FA | GT-1 Pos. 14 Can Replace |
1/22/2015 | 501F | GT-3 IGV Oiling |
1/22/2015 | 501F | GT-2 IGV Linkage repair |
1/20/2015 | 501D5 | GT-103 BSI |
1/20/2015 | 501F | GT-3 Basket Swap |
1/14/2015 | 501F | GT-2 BSI and Dental Mold |
1/5/2015 | 501D5 | GT-B BSI |
1/5/2015 | 501F | GT-2 BSI |
12/29/2014 | 501D5 | GTB - GTC BSIs |
12/29/2014 | 501D5 | GT-B Balance Shot |
12/18/2014 | 501D5 | ST102 Turning Gear Repair |
12/18/2014 | 501F | GT3 Orifice Change out |
12/17/2014 | 501F | GT3 BSIs |
12/17/2014 | 501D5 | GT102-104 BSIs |
12/17/2014 | 501D5 | GT101 Steam Leak Investigation |
12/16/2014 | 501F | GT1-GT2-GT3 BSI and Molds |
12/16/2014 | 501F | Hot Gas Path |
12/15/2014 | 501F | GTA/GTB - BSI and Molds |
12/10/2014 | Steam | ST-2 Major and Generator Work |
12/3/2014 | 501F | GT2 Basket Swap Services |
11/17/2014 | 501D5 | GT102 IGV Measuring |
11/14/2014 | STG Valve Rack Repair | |
11/13/2014 | 501F | GT1-3 Borescope Inspections |
11/12/2014 | Steam | Tech Support - Welding/Arc Gouging |
11/12/2014 | 501F | BT-GT2 Transition Change out |
11/10/2014 | 7FA | Row 2 Buckets |
11/7/2014 | 501F | GT-1 and GT-2 Borescope |
11/4/2014 | Steam | ST-2 Major and Generator Work |
11/3/2014 | 501F | GT1 & GT2 Borescope Inspections |
10/30/2014 | 7FA | GT 101 Hot Gas Leak |
10/29/2014 | 7FA | |
10/17/2014 | 501F | Witches hat cleaning/Orifice plate replace |
10/17/2014 | 501F | GT-1 4 way joint repair |
10/16/2014 | 501D5 | GT-1 Borescope |
10/16/2014 | 501F | GT-1 and GT-2 Borescope |
10/15/2014 | 501F | Swing & Sweep Check on Combustion Turbine |
10/14/2014 | 501D5 | Technical Assistance |
10/9/2014 | 501F | Engineer to oversee Combustor Ins. Outage |
10/8/2014 | 501F | Flip Compressor Cover in P1 area |
10/8/2014 | 501F | GT-3 TP Replacement |
10/8/2014 | 501D5 | #10 Basket Chang out - GTA |
10/7/2014 | 501F | GT-3 Borescope Inspection |
10/1/2014 | 501F | GT-3 Combustion Inspection |
10/1/2014 | 501F | GT-3 Torque Converter |
9/30/2014 | 501F | GT-3 BSI |
9/19/2014 | 501F | GT-2 BSI |
9/18/2014 | 501F | Inspect & clean witches hats CT-6 |
9/15/2014 | 501D5 | Technical Consultant |
9/15/2014 | 501F | Dental Molds GT-3 |
9/15/2014 | 501F | GT-4 Borescope Inspection |
8/13/2014 | 501D5 | GT1-3 - Joint Leak Repair |
8/13/2014 | 501F | GT-3 Borescope Inspection |
8/12/2014 | 501D5 | Install Balance Shot |
7/29/2014 | 7FA | GT5 Fuel Nozzle Change out |
7/28/2014 | 7FA | GT4 Fuel Nozzle Change out |
7/11/2014 | 501F | Floating Seal Pin |
7/10/2014 | 501F | Borescope |
7/10/2014 | D11 | Steam Valve Actuator |
7/10/2014 | 501D5 | Support Housing Changeout |
7/9/2014 | 501F | Pull "A" Stage Witches Hats |
6/26/2014 | 501D5 | CT-1 Generator Bearing |
6/18/2014 | 501F | GT-1 & GT-2 BSI and Mold Support |
6/18/2014 | 501F | GT-2 Basket Change out |
6/12/2014 | 501D5 | GT103 Generator Support |
6/12/2014 | 501D5 | Field Services |
6/10/2014 | 501F | GT-2 and GT-3 BSI |
6/10/2014 | 501F | GT-2 Turnkey BSI |
6/10/2014 | 501D5 | Crane Operator |
6/6/2014 | 501F | Dental Mold Support |
6/3/2014 | 501F | GT-1 Borescope |
5/29/2014 | 7FA | Balance Shot |
5/28/2014 | 501F | Borescope |
5/28/2014 | 501D5 | Borescope |
5/28/2014 | 7EA | Field Coating |
5/28/2014 | D11 | Shop Work |
5/28/2014 | D11 | Steam Turbine Minor |
5/28/2014 | 7FA | Freestone GT 2 |
5/28/2014 | 7FA | GT 1 Hot Gas Path |
5/19/2014 | 501F | R4 ISS Bolt Issue - GT-B Labor Support |
5/15/2014 | 501D5 | GT103 Major Inspection |
5/15/2014 | 501D5 | Big Cajun Balance Shot |
5/15/2014 | 7FA | Borescope GT-2 |
5/15/2014 | 501F | BSI of HGP GT-2 |
5/13/2014 | 7FA | GT-1 Hot Gas Path |
5/13/2014 | D11 | Steam Turbine Minor |
5/12/2014 | 7FA | GT-1 R1B Replacement |
5/12/2014 | 501F | P2 BFWP A101 Millwright Support |
5/9/2014 | 501F | GT-2 BSI |
5/8/2014 | 501F | Borescope GT-2 |
5/7/2014 | 501F | Borescope GT-1 |
4/30/2014 | 7EA | GT-1 Hot Gas Path |
4/3/2014 | Steam | ST2 Minor Inspection |
3/31/2014 | 501F | ST2 Minor Inspection |
3/31/2014 | 7EA | Exhaust |
3/28/2014 | 501F | Enlarge thermal well holes |
3/27/2014 | 501D5 | Major |
3/26/2014 | 501D5A | U2 Hot Gas Path |
3/26/2014 | 501D5A | U3 Hot Gas Path |
3/26/2014 | 7FA | GT-3 Labor Support |
3/25/2014 | 501F | ST2 Minor Inspection |
3/24/2014 | 501F | GT1 Orfice Change |
3/20/2014 | 501D5 | GT103 Major Inspection (Partial Bill) |
3/20/2014 | 501F | GT2 Replace row 1 vanes |
3/20/2014 | 7FA | Repair roof panel |
3/20/2014 | 7FA | NDE Support |
3/20/2014 | 7FA | GT2 Fuel Nozzle Replacement |
3/17/2014 | 7FA | InSafe |
3/11/2014 | 501D5 | Balance Shot |
3/11/2014 | 501F | ST2 Minor Inspection |
3/11/2014 | 501F | Witches Hat |
3/6/2014 | 501F | GT3 Combustion Inspection |
3/6/2014 | 501F | GT3 Vane Issue |
3/3/2014 | 501F | HGP/Generator Insp. |
2/25/2014 | 501F | ST2 Minor Inspection |
2/25/2014 | 7FA | Balance Shot |
2/24/2014 | 501F | Torque Pin |
2/24/2014 | 501F | Install Instrumentation |
2/24/2014 | 501F | QA/QC Engineering Hrs |
2/24/2014 | 7FA | Repack Cross Fire Tubes |
2/19/2014 | 501D5 | Technical Assistance |
2/19/2014 | 501F | HGP/Generator Insp. |
2/19/2014 | 501F | Generator work |
2/19/2014 | 501F | Rotor Work |
2/12/2014 | 501F | Borescope |
2/11/2014 | 501F | HGP/Generator Insp. |
1/30/2014 | 501F | Borescope |
1/30/2014 | Fr 5 | Dissassembly |
1/29/2014 | 7FA | R0 Blending |
1/23/2014 | 501F | Compressor Inspection |
1/23/2014 | 501D5 | Borescope |
1/20/2014 | 501F | Borescope |
12/19/2013 | Steam | Valve |
12/18/2013 | 501D5 | Borescope |
12/18/2013 | 501D5 | Combustion Inspection |
12/18/2013 | 7FA | Combustion Inspection |
12/9/2013 | 7FA | Hot Gas Path |
12/6/2013 | 501D5 | Borescope |
12/6/2013 | 501F | Borescope |
12/6/2013 | 501F | Borescope |
11/26/2013 | 501D5 | Dissassembly |
11/26/2013 | 501F | R1 Vane Change |
11/26/2013 | 7FA | Fuel Nozzle |
11/22/2013 | 501F | Borescope |
11/22/2013 | 501F | Borescope |
11/21/2013 | 501F | Borescope |
11/21/2013 | 501F | Borescope |
11/21/2013 | 7FA | Hot Gas Path |
11/20/2013 | 501F | Technical Assistant |
11/20/2013 | 501F | Miscellaneous |
11/19/2013 | 501F | Safety Rep |
11/19/2013 | 7FA | Fuel Nozzle |
11/9/2013 | 501F | Borecopse Plus |
11/8/2013 | 501F | Borecopse Plus |
11/8/2013 | 501D5 | Miscellaneous |
11/8/2013 | 501F | Technical Assistant |
11/8/2013 | 7Fa | Fuel Nozzle |
10/31/2013 | 501F | Installation |
10/31/2013 | 501F | Installation |
10/29/2013 | 501F | Hot Gas Path |
10/29/2013 | 501F | Safety Rep |
10/28/2013 | 7FA | Hot Gas Path |
10/28/2013 | 7FA | Safety Rep |
10/28/2013 | 7FA | Miscellaneous |
10/28/2013 | 501F | Borescope Plus |
10/23/2013 | 501F | Fuel Nozzle |
10/23/2013 | 7FA | Subcontracting |
10/10/2013 | 501D5 | Miscellaneous |
10/10/2013 | 501D5 | Gasket Changes |
10/10/2013 | 501F | Orifice Change Out |
10/10/2013 | 7FA | Fuel Nozzle |
10/7/2013 | 501F | Borescope |
10/7/2013 | 501F | Safety Rep |
9/23/2013 | Misc | Miscellaneous |
9/18/2013 | 501F | Borescope |
9/18/2013 | 501D5 | Exciter bearing |
9/17/2013 | 501F | Borescope |
8/30/2013 | 501D5 | Fuel Nozzle |
8/27/2013 | 501D5 | Combustion Inspection |
8/26/2013 | 501F | Gasket Change |
8/26/2013 | 501F | Borescope Plus |
8/13/2013 | 501D5 | Generator Field Pull |
8/6/2013 | 501F | Orifice Change Out |
7/25/2013 | 501D5 | Miscellaneous |
7/24/2013 | 501F | Borescope |
7/24/2013 | 501D5 | Gasket Change |
6/25/2013 | 501F | Borescope |
6/24/2013 | 501F | Borescope |
6/24/2013 | 7FA | Fuel Nozzle |
6/18/2013 | 501F | Hot Gas Path |
6/17/2013 | 501F | Borescope |
6/17/2013 | D11 | Turning Gear |
6/17/2013 | LM6000 | Subcontracting |
6/10/2013 | Steam | Valve |
6/10/2013 | Steam | Technical Assistant |
5/31/2013 | 7FA | Generator Seal |
5/31/2013 | 7FA | Exhaust Flex Seal |
5/28/2013 | 501F | Borescope |
5/28/2013 | 7FA | Hot Gas Path |
5/27/2013 | 501F | Borescope |
5/27/2013 | 501F | Subcontracting |
5/21/2013 | 501F | Borescope |
5/20/2013 | 501F | Borescope |
5/20/2013 | 501F | Orifice Change Out |
5/20/2013 | 501F | Basket Swap |
5/17/2013 | 7FA | Major |
5/14/2013 | 501F | Borescope |
5/12/2013 | 501F | Subcontracting |
5/4/2013 | 501F | Exciter Bearing |
5/4/2013 | 501F | Torque Converter |
5/1/2013 | 7FA | Fuel Nozzle |
5/1/2013 | 7FA | Fuel Nozzle |
4/30/2013 | 501F | Borescope |
4/30/2013 | 7FA | Bucket Work |
4/29/2013 | 501F | Subcontracting |
4/26/2013 | 501F | Borescope |
4/24/2013 | 501D5 | Borescope |
4/24/2013 | 501F | Borescope |
4/24/2013 | 7FA | Transition Change |
4/23/2013 | 501F | Borescope |
4/23/2013 | 501F | Borescope |
4/18/2013 | 7FA | Generator Seal |
4/18/2013 | 7FA | Fuel Nozzle |
4/18/2013 | Steam | Valve |
4/16/2013 | 501D5 | Balance Shot |
4/16/2013 | 7FA | Exhaust Flex Seal |
4/16/2013 | 7FA | 1st Stage Shroud Blocks |
4/16/2013 | 501F | Borescope GT 1 |
4/15/2013 | 501F | Basket Swap |
4/4/2013 | 501D5 | Hot Gas Path |
4/4/2013 | 501F | Technical Assistant |
4/1/2013 | 501F | Bearing and TA |
4/1/2013 | 501F | Borescope GT 1 |
3/28/2013 | 7FA | Fuel Nozzle |
3/27/2013 | 501D5 | Thrust Bearing |
3/26/2013 | 7FA | Hot Gas Path |
3/26/2013 | 7FA | Combustion Inspection |
3/26/2013 | Steam | Bearing |
3/22/2013 | 501F | Borescope |
3/22/2013 | 501D5 | TP Replacement |
3/16/2013 | 7EA | Technical Assistant |
3/15/2013 | Steam | Valve |
3/15/2013 | 501F | Borescope GT 1 |
3/14/2013 | 501D5 | Hot Gas Path |
3/13/2013 | 7FA | Combustion Inspection |
3/11/2013 | 501D5 | Major |
3/11/2013 | 7FA | Liner Change Out |
3/8/2013 | 501F | Technical Assistant |
3/7/2013 | 501D5 | Major |
3/7/2013 | 501F | Borescope GT 2 |
3/6/2013 | 501F | Borescope |
3/6/2013 | 501F | Basket Swap |
3/5/2013 | 501F | Borescope |
3/5/2013 | 501F | Borescope |
3/4/2013 | 501D5 | Subcontracting |
2/28/2013 | 7EA | Technical Assistant |
2/26/2013 | 7FA | Oil Leak |
2/22/2013 | 501F | Borescope |
2/22/2013 | 501F | Borescope |
2/20/2013 | 7B | Technical Assistant |
2/19/2013 | 501F | Orifice Change Out |
2/18/2013 | 501D5 | Borescope |
2/18/2013 | 501F | Borescope |
2/15/2013 | 501D5 | Row 2 |
2/14/2013 | 7EA | Technical Assistant |
2/14/2013 | ST | Valve |
2/13/2013 | 501D5 | Fuel Nozzle |
2/7/2013 | 7FA | Fuel Nozzle |
2/5/2013 | 501F | Miscellaneous |
2/5/2013 | 7EA | Technical Assistant |
2/4/2013 | 501F | Borescope |
2/4/2013 | 501F | Borescope |
2/4/2013 | 501D5 | Major |
1/25/2013 | 501D5 | Borescope |
1/25/2013 | 501F | Borescope |
1/25/2013 | 501F | Bucket Work |
1/25/2013 | 7FA | Combustor Misc. |
1/10/2013 | 501F | Borescope |
1/10/2013 | 501F | Borescope |
1/10/2013 | 501F | Borescope |
12/12/2012 | 7FA | Borescope |
12/12/2012 | 7FA | H2 Seals |
12/12/2012 | BOP | Miscellaneous |
12/6/2012 | 501D5 | Combustion Inspection |
12/6/2012 | 501F | Hot Gas Path |
12/4/2012 | 7FA | Generator Pull |
11/27/2012 | 501F | Borescope |
11/27/2012 | 501F | Combustion Inspection |
11/26/2012 | 501F | Engineering Support |
11/16/2012 | D11 | ST Valves |
11/14/2012 | 501F | Miscellaneous |
11/13/2012 | 501F | Miscellaneous |
11/13/2012 | 7FA | Fuel Nozzle |
11/9/2012 | 501D5 | Engineering Support |
11/9/2012 | 501F | Engineering Support |
11/9/2012 | 7FA | Fuel Nozzle |
11/9/2012 | 7FA | H2 Seals |
11/9/2012 | Steam | Valve |
10/31/2012 | 501F | Subcontracting |
10/31/2012 | 501F | Combustion Inspection |
10/19/2012 | 501F | Borescope |
10/19/2012 | 501F | Hot Gas Path |
10/19/2012 | 7FA | Fuel Nozzle |
10/17/2012 | 501F | Borescope |
10/9/2012 | 7FA | Fuel Nozzle |
10/2/2012 | Steam | Engineering Support |
9/30/2012 | 7EA | Engineering Support |
9/27/2012 | Steam | Engineering Support |
9/26/2012 | 7FA | Fuel Nozzle |
9/25/2012 | 501F | Borescope |
9/25/2012 | 501F | Engineering Support |
9/25/2012 | 7FA | Engineering Support |
9/24/2012 | 501F | Basket Swap |
9/13/2012 | 501F | Basket Swap |
9/6/2012 | 7FA | CI |
8/21/2012 | 501D5 | Brscp + General Health |
8/20/2012 | 7FA | Buckets and Blending |
8/7/2012 | 501D5 | HGP |
8/7/2012 | 501D5 | CI |
7/16/2012 | 501F | Engineering Support |
7/14/2012 | 7FA Gen | Engineering Support |
7/12/2012 | 501D5 | F/N |
7/12/2012 | 501D5A | VIBRATION ANALYSIS |
7/12/2012 | 7FA | F/N |
7/12/2012 | GE FR5 | Major |
7/2/2012 | 501D5 | CI |
6/14/2012 | 7FA | HGP + |
5/31/2012 | 501D5 | F/N |
5/31/2012 | 501F | Basket Swap |
5/31/2012 | 7FA | R0 change |
5/25/2012 | 501F | Engineering Support |
5/18/2012 | 501D5 | Miscellaneous |
5/17/2012 | 501F | borescope |
5/17/2012 | 501D5 | ci |
5/11/2012 | 501D5 | Starting Pkg aligment |
5/11/2012 | 501D5 | HGP |
5/7/2012 | 501F | Basket Swap |
5/7/2012 | 501F | Basket Swap |
5/3/2012 | 7FA | HGP |
4/30/2012 | 501D5 | HGP |
4/30/2012 | 501F | Engineering Support |
4/30/2012 | 7FA | Miscellaneous |
4/30/2012 | 7FA | HGP |
4/30/2012 | 7FA | HGP |
4/30/2012 | 501F | Brscp + General Health |
4/30/2012 | 501F | Brscp + General Health |
4/22/2012 | 501F | Brscp + General Health |
4/19/2012 | 7EA | F/N |
4/19/2012 | 7FA | Buckets and Blending |
4/18/2012 | 501F | Brscp + General Health |
4/13/2012 | 501F | F/N |
4/13/2012 | 501F | F/N |
4/13/2012 | 7FA | Buckets and Blending |
4/12/2012 | 7FA | Buckets and Blending |
4/12/2012 | 7FA | Buckets and Blending |
4/10/2012 | 501D5 | CI |
4/10/2012 | 7FA | CI |
4/10/2012 | 501F | Brscp + General Health |
4/3/2012 | 501F | borescope |
4/3/2012 | 501F | Basket Swap |
3/30/2012 | 7EA | mini CI |
3/30/2012 | 7FA Gen | Engineering Support |
3/27/2012 | 7FA | Misc |
3/26/2012 | 7FA | Engineering Support |
3/21/2012 | 7FA | Engineering Support |
3/21/2012 | ST D11 | HP rotor pull |
3/14/2012 | 501D5 | CI + Stg Pkg |
3/14/2012 | 501D5 | Misc |
3/14/2012 | ST D11 | HP rotor pull |
3/6/2012 | 7FA | R1 bucket change out |
3/6/2012 | ST D11 | HP rotor pull |
2/29/2012 | 501D5 | HGP |
2/28/2012 | 501F | borescope |
2/24/2012 | 501F | Basket Swap |
2/23/2012 | GE FR5 | Major |
2/19/2012 | 501D5 | HGP |
2/8/2012 | GE FR5 | Major |
2/3/2012 | 501F | Borescope |
1/30/2012 | 501D5A | Major |
1/26/2012 | 501D5 | HGP |
1/23/2012 | 501D5 | Misc |
1/20/2012 | 501F | Basket Swap |
1/20/2012 | 501F | Basket Swap |
1/20/2012 | 7FA | Buckets and Blending |
1/16/2012 | 501D5 | CI |
12/30/2011 | 501D5 | MISC |
12/30/2011 | 7FA | HGP |
12/30/2011 | GE FR5 | TURB + GEN MAJOR |
12/19/2011 | 7FA | CI+ |
12/18/2011 | GE FR5 | TURB + GEN MAJOR |
12/12/2011 | 501F | Basket Swap |
12/11/2011 | GE FR5 | TURB + GEN MAJOR |
12/6/2011 | 501D5 | CI |
12/6/2011 | 501F | Basket Swap |
11/29/2011 | 7FA | Major |
11/23/2011 | 501F | F/N |
11/21/2011 | 7FA | F/N |
11/21/2011 | 7FA | CI |
11/14/2011 | 7FA | HGP |
11/14/2011 | 501F | Brscp + General Health |
11/14/2011 | 501F | Brscp + General Health |
11/7/2011 | 7FA | HGP |
11/3/2011 | 7FA | HGP |
11/2/2011 | 7FA | F/N |
10/27/2011 | 7FA | TG |
10/26/2011 | 7FA | HGP |
10/25/2011 | ST D11 | ROTOR PULL |
10/25/2011 | 501F | borescope |
10/20/2011 | 501D5A | Triple Major |
10/18/2011 | 501F | borescope |
10/18/2011 | 501F | Brscp + General Health |
10/14/2011 | 501F | borescope |
10/12/2011 | 7EA | F/N |
10/12/2011 | 501F | borescope |
10/5/2011 | 7FA | F/N |
10/5/2011 | 501F | borescope |
10/3/2011 | IMPACTS | |
9/29/2011 | 7FA | Buckets and Blending |
9/29/2011 | 7FA | F/N |
9/15/2011 | 501F | borescope |
9/8/2011 | 7FA | GEN COMPONENT RMV |
9/8/2011 | 7FA | Buckets and Blending |
8/29/2011 | IMPACTS | |
8/20/2011 | 7FA | CI |
8/19/2011 | 7FA | HGP |
8/15/2011 | 501F | Basket Swap |
8/6/2011 | 501D5 | CI |
8/4/2011 | 501F | borescope |
7/27/2011 | 501D5A | MISC |
7/6/2011 | 501D5 | borescope |
7/4/2011 | STEAM A10 | VIBRATION ANALYSIS |
6/23/2011 | 7FA | F/N |
6/13/2011 | 7FA | CI |
6/8/2011 | 501F | Engineering Support |
5/31/2011 | 7FA | Buckets and Blending |
5/23/2011 | 501D5 | HGP |
5/23/2011 | 7FA | Buckets and Blending |
5/23/2011 | 501F | borescope |
5/16/2011 | 501F | Engineering Support |
5/13/2011 | 501F | HGP |
5/13/2011 | 7FA | HGP + GEN |
5/11/2011 | 501F | borescope |
5/10/2011 | 501F | Engineering Support |
5/10/2011 | 501F | borescope |
5/4/2011 | 7FA | Misc |
5/4/2011 | 7FA | H2 Seals |
5/3/2011 | 7FA | HGP |
5/3/2011 | 501F | borescope |
5/1/2011 | 7FA | Buckets and Blending |
5/1/2011 | 7FA | CI |
4/26/2011 | 501D5 | F/N |
4/25/2011 | 7FA | Buckets and Blending |
4/25/2011 | 7FA | Misc |
4/19/2011 | 501F | Basket Swap |
4/19/2011 | 7FA | Engineering Support |
4/19/2011 | 7FA | Misc |
4/19/2011 | 501F | borescope |
4/12/2011 | 501D5 | HGP |
4/12/2011 | 7FA | Engineering Support |
4/11/2011 | 501D5A | Engineering Support |
4/11/2011 | 501D5A | Comp Bld&Diaph change |
4/11/2011 | 501F | Basket Swap |
4/6/2011 | 7FA | CI |
4/6/2011 | 7FA | CI |
4/6/2011 | 501F | borescope |
4/6/2011 | 501F | borescope |
4/6/2011 | 501F | borescope |
4/5/2011 | 7FA | CI |
4/4/2011 | 501F | borescope |
3/29/2011 | 501D5 | HGP |
3/29/2011 | 7FA | Engineering Support |
3/22/2011 | 501D5 | Generator |
3/21/2011 | 7FA | Engineering Support |
3/14/2011 | 7FA | Engineering Support |
3/8/2011 | 7FA | Engineering Support |
3/8/2011 | 7FA | H2 Seals |
3/8/2011 | 7FA | CI |
3/7/2011 | 7FA | Engineering Support |
3/7/2011 | 7FA | H2 Seals |
3/7/2011 | 7FA | RO Swap |
3/4/2011 | 501F | Borescope |
2/14/2011 | ST D11 | Major |
2/8/2011 | 501D5 | CI |
2/8/2011 | 501D5A | HGP + |
2/7/2011 | 7FA | Buckets and Blending |
2/2/2011 | 501D5 | FUEL LINE CLEANING |
2/2/2011 | ST D11 | Major |
2/1/2011 | 7EA | mini - CI |
2/1/2011 | 501F | Borescope |
1/29/2011 | 501G | Engineering Support |
1/26/2011 | 7FA | CI |
1/24/2011 | ST D11 | Major |
1/23/2011 | 501F | Basket Swap |
1/14/2011 | 7FA | CI |
1/11/2011 | 501F | Brscp + General Health |
12/28/2010 | 501D5A | Engineering Support |
12/27/2010 | 501F | Basket Swap |
12/16/2010 | 501F | Basket Swap |
12/16/2010 | 501F | F/N |
12/16/2010 | 7FA | HGP |
12/16/2010 | 7FA | CI |
12/14/2010 | 501F | F/N |
12/1/2010 | 501F | Comp Bld&Diaph change |
11/23/2010 | 7FA | Buckets and Blending |
11/23/2010 | 7FA | Buckets and Blending |
11/23/2010 | 7FA | F/N |
11/23/2010 | 501F | Borescope |
11/21/2010 | 501A | Trunnion work |
11/18/2010 | 501F | Basket Swap |
11/18/2010 | 7FA | CI |
11/18/2010 | Alstom ST | ST Minor |
11/10/2010 | 501D5 | Engineering Support |
11/10/2010 | 501F | Witches hats |
11/2/2010 | 7FA | Rink TG Upgrade |
11/1/2010 | 501F | Basket Swap |
11/1/2010 | 501F | Borescope |
10/24/2010 | 501F | HGP |
10/24/2010 | 501F | F/N |
10/22/2010 | 7EA | mini - CI |
10/20/2010 | 7FA | RO Swap |
10/15/2010 | 501F | Basket Swap |
10/10/2010 | 501F | Basket Swap |
10/10/2010 | 501F | Borescope |
10/10/2010 | 501F | Borescope |
9/25/2010 | 7FA | HGP |
9/20/2010 | 501F | F/N |
9/11/2010 | 501D5 | CI |
9/11/2010 | 501D5 | GEN |
8/22/2010 | 501F | Basket Swap |
8/4/2010 | 501F | Basket Swap |
7/23/2010 | STEAM GE | Engineering Support |
7/18/2010 | 501D5 | GEN |
7/18/2010 | 501D5 | CI |
6/8/2010 | 501D5 | CI |
6/2/2010 | 7FA | f/N |
5/18/2010 | 501D5 | F/N |
5/18/2010 | 501F | Engineering Support |
5/7/2010 | 7EA | Torque Converter |
5/7/2010 | 7FA | CI |
5/4/2010 | 7FA | RO Swap |
4/21/2010 | 7FA | F/N |
4/18/2010 | 501F | Basket Swap |
4/12/2010 | 7FA | Buckets and Blending |
4/9/2010 | 501F | Basket Swap |
4/9/2010 | 7FA | CI |
4/6/2010 | 501F | CI |
4/6/2010 | 7FA | H2 Seals |
3/25/2010 | STEAM | VALVES |
3/24/2010 | 7EA | F/N CHANGE-OUT |
3/23/2010 | 501F | Major |
3/23/2010 | 501F | Engineering Support |
3/10/2010 | 7FA | Buckets and Blending |
3/6/2010 | 7FA | CI |
3/1/2010 | 501F | Borescope |
2/12/2010 | 501F | F/N |
2/1/2010 | 501D5 | Torque Converter |
2/1/2010 | 501D5 | MISC |
1/6/2010 | 501D5 | F/N |
1/6/2010 | 7FA | CI |
1/5/2010 | 501F | Orfice change |
1/5/2010 | 7FA | HGP |
12/30/2009 | 501D5 | CI + |
12/22/2009 | 7FA | Buckets and Blending |
12/21/2009 | 501F | F/N |
12/18/2009 | 501D5 | CI + |
11/23/2009 | 7FA | CI + |
11/18/2009 | 7FA | Buckets and Blending |
11/17/2009 | ST D11 HP | COVER PULL + |
11/12/2009 | 7FA | Buckets and Blending |
11/12/2009 | 7FA | Buckets and Blending |
11/2/2009 | ST D11 VLV | OVERHAUL VALVES |
10/20/2009 | 501D5 | HGP + |
10/14/2009 | 501F | Engineering Support |
10/14/2009 | 501F | F/N |
9/15/2009 | 501F | F/N |
9/15/2009 | 7FA | F/N |
8/11/2009 | 7FA | CI + |
8/4/2009 | 7FA | F/N CHANGE-OUT |
8/3/2009 | 501D5 | HGP |
8/3/2009 | 7FA | F/N CHANGE-OUT |
6/16/2009 | 501D5 | FUEL LINE CLEANING |
6/8/2009 | FR3 | TUNING |
5/18/2009 | 7FA | F/N |
5/1/2009 | 501D5 | GT3 GEN |
5/1/2009 | 7FA | F/N |
4/14/2009 | 501D5 | GT3 GEN |
4/14/2009 | 7EA | HGP |
4/14/2009 | 7FA | Buckets and Blending |
3/13/2009 | 7FA | Buckets and Blending |
3/7/2009 | 7FA | Buckets and Blending |
2/23/2009 | 501D5 | GT3 CI |
2/10/2009 | 7FA | CI + |
2/9/2009 | 501D5 | GT3 MISC |
2/3/2009 | 501D5 | GT2 MISC |
2/3/2009 | 501D5 | GT2 CI |
1/25/2009 | 7FA | Buckets and Blending |
1/19/2009 | 501D5 | GT4 MJR + GEN |
7FA | ||
501F | ||
501F | ||
7FA | ||
501D5 | ||
501D5 | Borescope Inspection |